| Framing: RoofFebruary 11: the rafters go up.
The knee wall holding up the rafters on the east side of the house:
The view from below:
February 12: the west-side knee wall:
Looking down the ridge facing south:
Exterior views:
February 13: both roofs are decked and papered.
February 15: some images of the roof from the bottom of the stairs.
And two shots of the overhang before the trim goes on:
More: main index | framing index | garage | first floor, joists and subfloor | first floor, walls | first floor, rooms | first floor, gallery | stairs | second floor, joists and subfloor | second floor, walls | second floor, rooms | second floor, tub | second floor, gallery | attic | garage roof | house roof | roof trim | ||||