Framing: Second floor: Walls

January 30: the front and back walls go up.

The view of the lake out the study window from outside and inside:

From halfway down the driveway:

From the street:

January 31: raising the north wall (study on the left, back bedroom on the right).

Nailing it down:

Raising the south wall (master bath on the left, master bedroom on the right):

Nailing it down:

Framing the wall separating the master bedroom (right) and stairwell from the master bathroom and walk-in closet:

The finished second story from the driveway apron (south view):

More: main index | framing index | garage | first floor, joists and subfloor | first floor, walls | first floor, rooms | first floor, gallery | stairs | second floor, joists and subfloor | second floor, walls | second floor, rooms | second floor, tub | second floor, gallery | attic | garage roof | house roof | roof trim

Last Modified: