Dave Person and his crew get the garage door framed (January 14) and start in on the side walls:

By the time the side walls are up, the trim joists and Advantech subflooring sheets for the main house have been delivered, and have to be stored temporarily in the garage -- space is limited at the top of the hill:

More: main index | framing index | garage | first floor, joists and subfloor | first floor, walls | first floor, rooms | first floor, gallery | stairs | second floor, joists and subfloor | second floor, walls | second floor, rooms | second floor, tub | second floor, gallery | attic | garage roof | house roof | roof trim