Siding

February 19: popping chalk lines for the siding.

February 20: the siding starts going up.

February 21: heading up the back wall, behind the scaffolding for the bay window.

February 28: the southern gable is completely sided.

March 1: Dave's crew starts putting the scaffolding up.

March 4: the bay window is framed and sided:

March 7, 5 pm: the east and north walls (the only walls we need scaffolding to side and paint), with the siding all the way up the east wall (left) and almost all the way up the north wall (right). The waferboard is also finally going up on the north gable.

The study window from the outside, with a view of the lake:

March 12: the siding goes up on the first-floor gallery.

More: index | precut | pond | tree cut | grading | driveway | house site | dry creek bed | footings | foundation | framing | doors and windows | siding | roofing | exterior painting | utilities | galleries: columns and decking | insulation | drywall | interior painting | paving | flooring | cabinets | lawn